# Matsumoto S-71 pulsed-discharge STEM kit

A kit for repeating, in a supervised school lab, the single-pulse underwater discharge that
Dr Takaaki Matsumoto recorded in logbook entry **S-71** (27 Oct 1997): a 1 mm wire just touching
a potassium hydroxide solution inside a five-sided copper box, hit with one burst of 120 V AC.

**Read [SAFETY.md](SAFETY.md) before building or using any of this.** The design has not been
built, bench-tested or certified. It is a design package, not an approved product.

![cell](CAD/out/images/cell_inside.png)

## What is in this folder

| Folder | Contents |
|---|---|
| `CAD/` | Parametric 3D-printable parts, built with SolidCraft: beaker cap (4 parts + hood) and electronics case (2 parts). STL (print-ready), STEP, `.sc` designs, pictures. All the STEP files can be opened and reviewed in SolidCraft, the open-source modeller the parts were designed in (https://github.com/tangency-labs/solidcraft). See [CAD_README.md](CAD_README.md). |
| `Electronics/` | Schematics, BOM, a machine-checked stripboard layout, and a PCB (Gerbers) that uses the same layout. See [Electronics_README.md](Electronics_README.md). |
| `Templates/` | 1:1 cutting and folding template for the copper box. |
| `Docs/` | The logbook page and the source papers. |
| `SAFETY.md` | Hazards, the controls designed in, what the teacher must do, and commissioning tests. |
| `BOM/` | The complete bill of materials, one list per aspect, a "needed but not in the kit" list with typical costs, and `discrepancies.md`. |
| `BareMinimum/` | The least apparatus an experienced experimentalist needs to run the experiment in an equipped lab. |
| `Render/`, `Website/` | Blender renders and clips, and the static website (see `Website/DEPLOY.md`). |
| `Kickstarter/` | Crowdfunding material: costing and tiers, verification plan and budget, campaign text, graphics, films. |

## What the original experiment was

From the logbook page and Ref. 71 (table 1):

| | S-70 | **S-71** | S-72 |
|---|---|---|---|
| Wire (cathode) | Pb, 1 mm | **Pb, 1 mm, about 180 mm long** | Pb, 1 mm |
| Electrolyte | KOH 1.5 mol/L | **KOH 1.5 mol/L** | Cs2CO3 0.6 mol/L |
| Anode | Cu box | **Cu box 25 x 25 x 30 mm, five faces (T, F, L, R, B), back open, hole in top** | Cu box |
| Drive | pulsed AC 120 V | **pulsed AC 120 V, started at phase angle 0** | pulsed AC 120 V |
| ON time | 80 ms | **800 ms** | 20 ms |
| Shots | 4 | **1** | 5 |

The logbook notes for S-71: "the effect of a long pulse is small; the effect of the initial surge is
marked", and the sketch shows a ball at the tip of the wire after the discharge. The logbook gives the
OFF time as 20 **s**; the table in Ref. 71 prints 20 **ms** for all three runs. That could not be resolved
from the documents, and it does not matter for single shots.

Sapporo is on 50 Hz mains, so 20 / 80 / 800 ms are exactly 1 / 4 / 40 mains cycles.

## How the kit reproduces it

| Original | Kit | Why |
|---|---|---|
| 120 V AC pulse from the mains | 110 V nominal (about 119-123 V off load) from an **isolating transformer**, plus a 55 V "first trials" level | The original brief asked for a divider or rectifier straight from the mains. The design does not do that: nothing connected to a live mains conductor can be made safe on an open electrolyte cell in a classroom. The transformer also handles 110 V and 230 V countries with one build-time wiring choice. |
| Pulse gated at phase angle 0 | Two inverse-parallel **SCRs** fired by zero-crossing opto-triacs | Starts at a zero crossing and stops at a current zero, so only whole half-cycles are delivered. |
| 800 / 80 / 20 ms | 555 timer, selectable 800 / 80 / 20 ms | See limits below. |
| One shot | One shot per press of FIRE, then a 24 s lock-out | Matches the logbook's 20 s OFF. |
| Open dish on the bench | Clip-on cap over a rectangular glass vessel, vented upward and backward, with an interlock switch | Keeps fingers and faces away from the electrolyte and the live parts. |
| Pb wire | **Aluminium, iron or tin wire for class use**; pure tungsten as an option | Arcing lead makes lead fume. Aluminium (and, slowly, tin) is attacked by the alkaline electrolyte: keep the time from putting the cap on to FIRE short, and lift the cap off after the shot. See SAFETY.md. |
| "AC pulse" | AC by default; a switch selects full-wave rectified pulses (wire always negative) | A rectifying option was requested. |

### Why aluminium wire, and tungsten as an option

Aluminium has one stable isotope (aluminium-27), and that nucleus has spin (5/2). Of the four most conductive elements (silver, copper, gold and aluminium) it is **uniquely** paramagnetic: the other three are diamagnetic. It is attacked by the
alkaline electrolyte (see SAFETY.md), and aluminium itself cannot count as a find on an aluminium wire.

**Pure tungsten wire is an option** alongside the three class-use wires. Tungsten is a good conductor, is paramagnetic and has the highest melting point of any metal; it is also a heavy nucleus, and in the reaction tables below splitting it has a positive energy balance (an energy sum, not an observation). It is not supplied in the kit, and preparing it is a teacher's job: see "Tungsten wire (option)" in SAFETY.md.

The kit does not say what you should expect to find: "What elements can you make?" is a question for you to answer,
with blanks and controls. If you want to explore which combinations of nuclei would release energy by their mass
balance, the reaction tables built from Dr Alexander Parkhomov's data are at [nanosoft.co.nz](https://www.nanosoft.co.nz/Fusion.php) and
[lenr.academy](https://lenr.academy/fusion?e1=H%2CD%2CO&e2=Al&limit=500). They are energy sums, not observations, and mainstream physics does not accept that such
reactions occur in these conditions.

### Limits you should know about

- **Pulse length is set by an RC timer, not by counting cycles.** The SCRs then round it to whole
  half-cycles, so you get the nominal count plus or minus one half-cycle (800 ms is 80 +/- about 4
  half-cycles with 5 % parts). In AC mode the polarity of the first half-cycle is random.
- **Burst trains with a 20 ms gap are not supported.** Every shot is followed by a 24 s lock-out.
- **A 10 ohm ballast and the transformer's own impedance limit the current** to about 4.6 A at 110 V into
  a dead short. Matsumoto's source was probably stiffer, so the initial surge is smaller here.
  That is a deliberate safety trade.
- The team's 2025 replication used 250 ms. To get that, fit 330k for R15: the 80 ms position becomes 250 ms.

## The pieces

**Cell.** A cap clips onto the vessel by six sprung fingers (about 3 N of grip, so it lifts off
upward rather than letting pressure build). The wire drops through a clamp tower, a guide tube and a
second guide just above the box. The copper box slides into rails on a carrier hanging from the cap,
and its strap bolts to an anode stud. A pointer on the carrier marks both the electrolyte fill level
and the height to set the wire tip. Gas, steam and droplets leave through a baffled vent that faces
away from the operator and has a slot for a copper witness strip, as Matsumoto used "monitoring
plates" above the water.

**Pulse unit.** Mains inlet, 80 VA isolating toroid, 12 V supply module, control board, and a
relay that connects the output sockets only for 1.6 s around each shot and only while the cap
interlock is closed. A teacher's key switch selects 55 V / OFF / 110 V.

![power path](Electronics/out/schematic_power.png)

## Build order

1. Read SAFETY.md. Decide who the competent adult is for the mains wiring.
2. Measure your glass vessel, edit `CAD/params.json` if it differs from 105 x 85 x 80 mm, and run
   `python3 CAD/build_cad.py`. Print the seven parts in PETG, or ASA/ABS (not PLA).
3. Build the control board (stripboard or PCB) from `Electronics/out/`.
4. Assemble the case and wire the chassis from `Electronics_README.md`.
5. Run every commissioning test in SAFETY.md, in order, before any electrolyte goes near it.
6. Cut and fold a copper box from `copper_box_template.pdf` (print at 100 %, check the 50 mm bar).

## Running S-71

Teacher steps are marked **T**.

1. **T** Key at OFF and removed, mains off. Safety screen between the cell and the class.
2. **T** Make up the electrolyte and fill the vessel until the surface just touches the pointer tip
   (about 97 mL for the reference vessel).
3. Slide a new copper box into the carrier rails, bring the strap up to the stud and tighten the
   thumb nut.
4. Cut 116 mm of 1 mm wire and straighten it. Feed it down through the clamp tower until the tip
   is level with the pointer tip, tighten both clamp screws, fit the red hood.
5. Clip the cap onto the vessel. Plug in the interlock jack, then the red and black leads.
   With aluminium or tin wire, decide the pulse settings and the level before this step, because the
   electrolyte starts to attack the tip as soon as it touches: then go through steps 6 to 8 without
   pausing, and note the time from cap on to FIRE. The order stays the same, so every connection is
   still made before the mains goes on.
6. Mains on. POWER and CAP OK light. Select 800 ms and AC.
7. **T** Turn the key to 55 V for a first look, or 110 V for the S-71 condition.
8. Everyone behind the screen, goggles on. Press FIRE once. The buzzer (if fitted) sounds for
   1.6 s, PULSE and OUTPUT flash.
9. WAIT stays lit for 24 s. **T** Key to OFF and out, mains off, before anyone touches the cell.
10. Lift the cap straight up, rinse the wire and box, and examine the wire tip and the inside of
    the box under a microscope. Slide the witness strip out of the vent.

Things for students to record: the wire length before and after, the shape of the tip, where
deposits land in the box, high-frame-rate phone video through the glass, and the difference between
55 V and 110 V, 20 ms and 800 ms, AC and rectified.

A note on interpretation for the classroom. What students will see directly (a glow at the wire
tip, a bang, a changed wire tip, deposits) is the well-documented "contact glow discharge" regime of
electrolysis. The interesting question is what the deposits are made of:

- Matsumoto reported carbon tubes "produced with the Pb and Cd wire electrodes" in what he called
  a carbon-free device (ISBL'97 paper, `Docs/SDENC-Ref.67.pdf`; his ICCF-7 paper is titled
  "Carbon Tubes and Films Produced in a Pb Electrode"), and the S-71 logbook page notes carbon
  and oxygen, and a carbon film from the lead ball, in the SEM/EDX results. In 2001 he summarised his work
  more generally: ring products "consisted of conventional elements, mainly carbon, not dependent
  on collapsed materials", a process he called "nuclear regeneration" (letter, *Fusion Science
  and Technology* 40, 108-109, July 2001, written about traces from his 1992 electrolysis
  experiment; copy in `Docs/incoming_2001/`).
- The wider published record. In the preface to his collected papers (5 January 2000,
  `Docs/SDENC-Preface.pdf`) Matsumoto argued that electromagnetic force could do in the laboratory
  what gravity does in a collapsing star. A second, far larger line of experiments ran at the same
  time: the Proton-21 laboratory in Kyiv (founded 1999) reports more than 6000 shots of a pulsed
  electron beam into pure metal targets in 1999-2004 and called the effect "electron-nuclear
  collapse" (booklet, `Docs/incoming_proton21/`). Adamenko and 14 co-authors from Kiev and Urbana,
  Illinois (including George Miley of the University of Illinois), *Results in Physics* 5 (2015)
  62-68 (https://doi.org/10.1016/j.rinp.2015.02.005), reported eleven elements above baseline (Al,
  Si, S, Ti, Cr, Mn, Fe, Ni, Zn, Ag, Pb) by outside mass spectrometry on 99.9999 % copper; their
  paper does not cite Matsumoto. A Belgian team witnessed Proton-21 experiments in 2007, with
  blanks, and signed a report in 2008 saying its verification "unambiguously confirms" them; it was
  organised by a company working with Proton-21, run on Proton-21's own machine, and is not a
  journal paper. Neither line of work is accepted by mainstream physics. The Kyiv results were
  examined by outside experts, but not repeated on another laboratory's own apparatus.
- The team behind this kit report that in their 2025 replication, SEM/EDX analysis found carbon
  and other common elements where they were not present before the shot. Their deep-zoom SEM
  image is published so anyone can inspect it.
- This interpretation is not accepted by mainstream physics. The team repeated Matsumoto's S-71
  independently: he had died, and they have never met the Kyiv team. Their own result has not yet
  been repeated by a laboratory independent of them, with blanks and controls. The open question is the source of the carbon: the lead itself, carbonate
  dissolved in the electrolyte, a film on the wire, or handling. In their images the dark,
  light-element material surrounds the lead balls and trails away across the copper, which argues
  against handling but does not say which of the others. Controls decide it: unfired wire, unfired
  copper, a no-pulse blank, electrolyte before and after, and handling blanks, examined the same
  way.

The kit reproduces the apparatus and conditions so that others can test the claim. Deciding what
the evidence shows, and which controls would settle it, is the exercise.

### Isotopes: what to measure first

Element analysis (SEM/EDX) says which elements are present, not where they came from. Isotope ratios can say more. Measuring them takes secondary-ion mass spectrometry (SIMS); a time-of-flight instrument (ToF-SIMS) records every mass at once. This is work for a laboratory, not a classroom.

Carbon shows how. Natural carbon is about 98.9 % carbon-12 and 1.1 % carbon-13, and every ordinary source (the electrolyte, a film on the wire, the air, a fingerprint) lies between about 0.96 and 1.16 % carbon-13.

1. **Measure first, with nothing added.** Send shots and no-pulse blanks made with ordinary materials for SIMS, with a carbon standard measured in the same session. Do this before any labelled isotope is bought or brought into the room: a trace of 98 % carbon-13 on the glassware would spoil every later measurement.
2. **Write the rule down before the first shot:** what range counts as natural, how many spots and repeats are needed, and what the blank must show.
3. **About 1.1 %:** the carbon is ordinary. A labelled test is then worth doing: dissolve carbon-13-labelled potassium carbonate in the electrolyte, and if the label appears in the deposits, the carbon came from the electrolyte.
4. **Much lower than 0.96 %:** no ordinary source gives this. It would point to carbon newly made as carbon-12. First rule out a wrongly set mass-13 peak and too few counts, then repeat, and have a second laboratory repeat it.
5. **Much higher than 1.16 %, with nothing added:** not ordinary either. One reading, a working idea of the kit's creators, is that the process gathers nuclei that have spin (carbon-13 has spin 1/2, carbon-12 has none), so that it concentrates the carbon-13 already there and does not make it. First rule out carbon-12 with a hydrogen atom attached (it also has mass 13), a saturated detector, and contamination by a labelled compound. A known chemical effect, the magnetic isotope effect, can also favour nuclei with spin, usually by a small amount.
6. **Test the spin idea in the same data.** If nuclei with spin are being gathered, other elements should show it too: iron-57 on an iron wire, tin-115, tin-117 and tin-119 on a tin wire, oxygen-17, silicon-29, and lead-207 where a laboratory repeats the original experiment with lead wire. Ordinary processes shift isotopes in step with their mass; a shift that follows spin and not mass would be the sign. Aluminium cannot show it: it has only one stable isotope.
7. **Only then decide about carbon-13.** If the data point to spin, adding a known amount of carbon-13 becomes a direct test: do the deposits end up richer in carbon-13 than the electrolyte they came from?

None of this has been measured. These are ways to read a result, written down before there is one, and the spin idea is the creators' own, not established physics.

## What has not been verified

- The glass vessel. No standard *square beaker* was found; the closest catalogued rectangular lab
  vessel is a 105 x 85 x 80 mm staining trough, which is the default. Wall thickness is assumed.
- Fit of bought-in parts: relay socket height, the 12 V module's footprint, the terminal-block
  barrel used as the wire clamp, and microswitch geometry (its mount is slotted for adjustment).
- The circuit has not been simulated or bench-tested. Timings are calculated. The layout is
  checked against the netlist by script, which proves the board matches the schematic, not that
  the schematic is right.
- The three videos were not watched during the design work. Their titles say the 2025 replication
  ran 120 V AC, 50 Hz, 250 ms.
- The CAD was driven through SolidCraft's command-line tool, `solidcraft-cli`, which uses the same
  engine as the app, so the scripts in `CAD/build/` can be replayed there.

## Copyright and use

Copyright Bob Greenyer 2026. Use of these resources is permitted for non-commercial purposes.
Material credited to others, including Dr Matsumoto's logbook and micrographs and the publications quoted, remains the property of its owners.
